永利澳门网址多少-www.34511.com

Welcome to [ Jiangsu Kengbo Heavy Industry Co., Ltd. ] Official Website!

HOME    |    Contact us    |    Sitemap

13585000194
15861488616
    CONTACT US
  • Contact: Mr.Wang
  • Mobile: 13585000194
  • Mobile: 15861488616
  • Tel: 0510-85388408
  • Fax: 0510-85388408
  • Web: www.wxkbjx.com
  • E-mail: sales@wxkbjx.com
  • 502492439@qq.com
  • Add: 42 Yuanqiao Road, Yixing
  • Economic Development
  • Zone, Wuxi City
NEWS

POSITION:HOME > NEWS

Create a third-party full casing and auxiliary parts rental service, and explore new ways of cooperation! 2022/02/23
On February 23, Shanghai Zoomlion Piling Machinery Co., Ltd. signed a strategic coopera...
Drilling Method of Underground Clearance of Full Circle Casi 2017/09/09
Full rotary drilling rig without leaving the pile construction technology is: the whole...
Advantages of Construction of Fully Mechanized Draft 2017/09/09
Safe and reliable, on the soil disturbance small clearance clearance Pile construction ...
General use of packing sleeves and rigid waterproof sleeves 2017/09/09
Rigid waterproof casing is a steel pipe plus wing ring (steel ring made on the ring tub...
Waterproof casing installation precautions 2017/09/09
Waterproof casing installation Note: When the surface is corrosive media, can be used t...
Application of High Strength Grouting Material in Machine To 2017/09/09
Machine equipment installation program is basically the basic inspection and release li...
The basic composition and composition ratio of grouting prod 2017/09/09
With the rapid development of the construction industry, now with another industry deve...
Development course of full - tube full - turn drilling rig 2017/09/09
In recent years, with the rapid development of the domestic economy, large and medium-s...
Casing effect 2017/09/09
1, all water supply pipe and casing is due to the pump or water flow will cause the pip...
Installation Basics 2017/09/09
1,first of all the basic surface of the whole chisel hair. According to the specific ci...
Wonderful review——into Kengbo Machinery 2021/11/16
  The just-concluded "Tenth Deep Foundation Eng...
The 10th Deep Foundation Engineering Development Forum and the 2nd Deep Foundation Engineering Techn 2020/08/31
Meeting time: September 3-6, 2020 Venue: Jinan Sungen International Convention and Ex...
20 record 1/2 page 12 Next

永利澳门网址多少|www.34511.com

XML 地图 | Sitemap 地图

永利澳门网址多少|www.34511.com

XML 地图 | Sitemap 地图