永利澳门网址多少-www.34511.com

Welcome to [ Jiangsu Kengbo Heavy Industry Co., Ltd. ] Official Website!

HOME    |    Contact us    |    Sitemap

13585000194
15861488616
    CONTACT US
  • Contact: Mr.Wang
  • Mobile: 13585000194
  • Mobile: 15861488616
  • Tel: 0510-85388408
  • Fax: 0510-85388408
  • Web: www.wxkbjx.com
  • E-mail: sales@wxkbjx.com
  • 502492439@qq.com
  • Add: 42 Yuanqiao Road, Yixing
  • Economic Development
  • Zone, Wuxi City
PROBLEM

location:HOME > PROBLEM

Advantages of Construction of Fully Mechanized Draft

Safe and reliable, on the soil disturbance small clearance clearance Pile construction method in the steel casing within the clearance pile and backfill construction, the underground undisturbed soil or damage is not small, the underground soil does not cause disturbance or produce a small The disturbance. As the steel casing on the hole wall support, in the steel casing around the soil stress has not yet released, it has been removed and timely backfill obstacles, the surrounding structures had no effect.
Relevant information

永利澳门网址多少|www.34511.com

XML 地图 | Sitemap 地图